Fields of expertise
from design to manufacturing set-up and installation
CASES in the WTG Value Chain
Turbine
Factories
Logistics & Pre-assembly
Offshore
Turbine
- Cooler top design
- High split steel tower design
- Offshore tower design
- Tower internals design
- Blades cost out
Blades Factories
- Shell mould design, 44, 49, 80m
- Shell mould technology upgrade, 55m
- Shell mould lifting equipment
- Glass fibre web lifting equipment
- Root joint winding equipment
- Root joint winding mandrel
- Carbon slab consolidation
- Mandrel pull winch
- Mandrel setting device
- Fiber deposition machines
- Factory layout
- Factory optimisation, through-put
- Web hangling & setting devices
- Process & equipment development Web Dry Fit removal
Nacelle Factories
- Turbine yaw assembly line
- Nacelle cover concept
- Nacelle back-end lifting
Tower Factories
- Factory optimization, through-put
Logistics & Pre-Assembly
- Value chain optimization
- Multi-blade transportation equipment
- Tower stacking equipment
- Tower upending and platform handling tool
- Jacket handling tool
Offshore
- Value chain analysis
- Installation vessel logistics; blade rack
- Installation vessel logistics; handling sequence
- Vertical tower sea fastening
- Full tower gripper
- Blade tip installation tool
- Sea fastening
- Support eqipment for radar and camera systems